The rooms ( cold room and pre-cold room ) for cooling and maturing the carcasses have been renovated and are now operational again.
These were covered with sandwich elements (Polystrol sandwich element Classic Glasboard/Sheet 100) and Glasboard plate material 2.3 mm. This system is now standard industrial and food processing This therefore meets hygiene and veterinary law .
This work was carried out to full satisfaction company WDS-Neumeyer GmbH (assembly of the panels) and Kühlanlagenbau Fritz Lachmayr mayr
A big thank you goes to the team from the HBLFA Raumberg-Gumpenstein , who provided active support (electrical installation, assembly of the pipe track, etc.) to get the system back into operation as soon as possible.